Champions for construction clients
It is important on all projects that there are designated client champions, '...to take responsibility for design quality throughout the project. This may be the departmental champion with a responsibility for all the organisation’s construction projects or an individual assigned the role specifically for the project (ref. Achieving Excellence Guide 9 - Design Quality).
It can be appropriate to appoint a number of champions:
- A senior design champion might be appointed to ensure that schemes do not proceed until they achieve an acceptable level of design quality.
- A project-level design champion might become more involved in the detail of the design.
- Special interest champions, might represent the interests of particularly important aspects of the project.
Special interest champions could be appointed to represent:
- Design quality.
- Customer interests.
- Staff interests.
- Information technology.
- Change management.
- Sustainability.
- Facilities management.
- A soft landings champion to ensure the design optimises operational performance and that there is a smooth transition from construction to occupation.
The role of champions might include:
- Articulating the vision for the project.
- Articulating the client's design quality aspirations.
- Ensuring that design objectives are clearly described in briefing documents.
- Evaluating design quality throughout the design process.
- Chairing user panels relevant to their particular area of responsibility.
It is important that design champions are appointed as soon as possible so that they can play a part in establishing the vision for the project. This will make them more likely to defend the vision.
Design champions do not need to have experience of construction projects, it is more important that their role is clearly defined and they are given the authority, time and support to enable them to perform this role. For many of those involved, the project will be a ‘parallel activity’ carried out in addition their day job. This means that their individual goals need to be re-aligned to include the project goals, rather than just being linked to their normal day job.
[edit] Related articles on Designing Buildings
- BREEAM launches local planning authority guidance.
- BREEAM sustainability champion.
- Client.
- Client requirements.
- Consultation process.
- Design quality.
- Design review.
- Integrated project team.
- Soft landings.
- Stakeholders.
- Stakeholder management: a quality perspective.
- Stakeholder map.
- Third party dependencies.
- User panels.
- Vision.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.